Local News
Missouri Route 25 in Stoddard County Reduced for Drainage Repairs
March 25th 2019 by Dee Loflin

Route 25 in Stoddard County will be reduced to one lane as Missouri Department of Transportation crews perform drainage repairs.
This section of roadway is located from James Drive to Route AF.
Weather permitting, work will take place Tuesday, March 26 and Wednesday, March 27 from 7 a.m. to 4 p.m. daily.
The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area.
For additional information, contact MoDOT’s Customer Service Center toll-free at 1-888-ASK-MODOT
Last Updated on March 25th 2019 by Dee Loflin
https://showmetimes.com/Blogpost/vcd2/Missouri-Route-25-in-Stoddard-County-Reduced-for-Drainage-Repairs
Work Resumes on Route Y in Stoddard and Scott Counties for Pavement Improvements
March 21st 2019 by Dee Loflin

Route Y in Stoddard and Scott Counties will be reduced with an 11 foot width restriction as contractor crews resurface the roadway.
This section of roadway is located 2.5 miles east of Route 25 to Route 61 in Sikeston, Mo.
Weather permitting, work will take place Thursday, March 21 through Friday, April 12 from 6:30 a.m. to 6:30 p.m. daily.
The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area.
For additional information, contact MoDOT’s Customer Service Center toll-free at 1-888-ASK-MODOT
Last Updated on March 21st 2019 by Dee Loflin
https://showmetimes.com/Blogpost/vcc6/Work-Resumes-on-Route-Y-in-Stoddard-and-Scott-Counties-for-Pavement-Improvements
Missouri Route 25 in Stoddard County Reduced for Drainage Repairs
March 20th 2019 by Dee Loflin

Route 25 in Stoddard County will be reduced to one lane as Missouri Department of Transportation crews perform drainage repairs.
This section of roadway is located from County Road 607 to County Road 632.
Weather permitting, work will take place Wednesday, March 20 through Friday, March 22 from 8 a.m. to 4 p.m. daily.
The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area.
For additional information, contact MoDOT’s Customer Service Center toll-free at 1-888-ASK-MODOT
Last Updated on March 20th 2019 by Dee Loflin
https://showmetimes.com/Blogpost/vcc4/Missouri-Route-25-in-Stoddard-County-Reduced-for-Drainage-Repairs
Route 114 in Stoddard County Will be Reduced to One Lane
March 15th 2019 by Dee Loflin

Route 114 in Stoddard County will be reduced to one lane as Missouri Department of Transportation crews perform bridge maintenance.
This section of roadway is located between Clement Street and Route 25.
Weather permitting, work will performed Tuesday, March 12 through Friday, March 15 from 8 a.m. to 3 p.m. daily.
The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area.
Last Updated on March 15th 2019 by Dee Loflin
https://showmetimes.com/Blogpost/vc9f/Route-114-in-Stoddard-County-Will-be-Reduced-to-One-Lane
Bridge Closure at Cairo, Illinois Starting March 18, 2019
March 06th 2019 by Dee Loflin

BRIDGE CLOSURE - US 60/62 SOUTH AT CAIRO
Alexander County, Illinois/Mississippi County, Missouri
Location - Cairo, IL
The Illinois Department of Transportation would like to alert motorists traveling in the Cairo area that the US 60/62 bridge over the Mississippi River will be closed.
The closures are scheduled to begin on Monday, March 18th at 8:00 a.m. extending through Thursday, March 21st, at 12:00 p.m. and Monday, March 25th at 8:00 a.m. extending through Thursday, March 28th at 12:00 p.m.
The bridge will be open to all traffic from 5:30 p.m. to 7:00 a.m. each night.
Crews will be performing required annual safety inspection of the structure.
Last Updated on March 06th 2019 by Dee Loflin
https://showmetimes.com/Blogpost/vc8h/Bridge-Closure-at-Cairo-Illinois-Starting-March-18-2019